Machinery and Spare Parts Import

When buying production machinery, line equipment or spare parts, the most critical point is finding the right manufacturer and verifying the technical specifications before ordering. In machinery imports, dimensions, weight, loading plan and customs matter as much as the product price in determining the total cost.

What do we check in this sector?

Manufacturer and supplier research

We distinguish the company that actually builds the machine from resellers, assessing company records, production history and references.

Technical specification verification

We compare technical items such as motor power, capacity, voltage/frequency, control unit, moulds and accessory lists line by line on the quotation.

Compatibility check for spare parts

We recommend not proceeding to order until the part number, original/equivalent status and compatibility with your existing machine are confirmed.

HS code, duty and import checks

Customs duty, VAT and any additional obligations are checked product by product based on the HS code of the machine and part.

Shipping dimensions and loading plan

The machine's gross/net weight, packed dimensions and disassembly status directly affect the choice between container, out-of-gauge or groupage transport.

Total import cost

We gather product price, freight, insurance, customs clearance, taxes, unloading and installation into a single cost table.

Risks you may face in the import process

  • Equipment missing from the quotation

    If moulds, accessories, software or the control panel are not included in the quotation, the total investment can grow after ordering.

  • Freight surprises caused by dimensions and weight

    Incorrectly declared packed dimensions lead to loads that do not fit the container and unexpected special transport costs.

  • Incorrect HS code declaration

    Ignoring that the machine and its parts fall under different tariff positions creates duty differences and correction risk at customs.

  • Unclear installation and service support

    If commissioning, training and warranty scope are not defined in the contract, the after-sales process becomes unmanageable.

  • Extended delivery time

    For made-to-order machinery, an unclear production schedule delays the investment plan and cash flow.

Let's review the technical quotation and cost table together for the machine or spare part you plan to buy.

Get a Pre-Assessment for My Product

How do we work?

1. Product and needs analysis

We clarify the machine's intended use, capacity expectations and your technical constraints together.

2. Manufacturer research and quotation comparison

Suitable manufacturers are researched and quotations are compared in the same format for technical content and delivery terms.

3. HS code and cost study

Duties are checked via the HS code and a door-delivered total cost table is prepared.

4. Order, logistics and customs follow-up

The loading plan, document flow and customs procedures are followed throughout the process.

Details on the whole process can be found on our How We Work page.

Evaluate Your Machinery Investment Before Ordering

Send us your machinery or spare parts quotation; we will review the manufacturer, technical content, HS code and total cost with a pre-assessment.